×
Menu
Index

Task Details Tab

 
Task Details Tab
 
The fields in this tab also appear in the Schedules Task Fields list and in the Task Details dialog. Entering data in this tab is the same as entering it those places.
 
1

TASK TOOLBAR

1. TASK TOOLBAR
 
  • Add Task Button - Adds an empty task which will, if you save it, appear at the end of the task list in the Gantt chart control.
  • Save Task Button - Click to save edits to the task. This has the same effect as click the Save Task button in the Gantt Chart Toolbar.
  • Delete Task Button - Deletes the task that is currently displayed in the Details tab.
2

DETAILS TAB FIELDS

2. DETAILS TAB FIELDS
 
  • Select Task Field - Use this drop down list to load a task in the Details tab. This has the same effect as clicking the View Details link in the Gantt chart.
  • Code Field - A text field
  • Task Field - The name of the task
  • Summary Field - A notational field used to group one or more tasks by a summary designation. To use this field: type an entry in this field and save the Gantt chart. The entry is saved to a list. You can then select this entry on other lines in the schedule.
  • Curve Field - The selected curve determines how the spread is calculated if you cost load the task.
  • Constraint Field - Constraints limit the calculation possibilities for a task. (Use caution when assigning constraints. Too many constraints can lead to unexpected calculation results and logic conflicts.) The choices are:
None (the default)
Finish No Later Than
Must Finish On
Must Start On
Start No Earlier Than
  • Constraint Date Field - The date associated with one of the four constraint types. Default is empty.
  • % Complete Field - Zero to 100. Default is "0". This represents the physical progress of the task's work.
  • Remaining Duration Field - See Task Fields for information
  • Status Field - See Task Fields for information
  • Recap Section - This read-only section shows data from the beginning and end of the critical path
  • Attachments Link - The number of attachments linked to this task line appears within the parentheses. Click the link to open the View Attachments Dialog.
  • Current, Baseline, Actual Table - See Task Fields for information
3

TASK DEPENDENCIES TAB

3. TASK DEPENDENCIES TAB
4

TASK RESOURCES TAB

4. TASK RESOURCES TAB
5

CHECKLISTS TAB

5. CHECKLISTS TAB
6

TASK PROJECT CODES TAB

6. TASK PROJECT CODES TAB
7

TASK NOTES TAB

7. TASK NOTES TAB