This tab shows a map, which can be configured by each user, with interactive map points representing projects. Map points, when clicked, open a dialog with current schedule and budget hyperlinks.
DOCKING BUTTONS
Click the Pin button to lock the grid in it's present state. Click the X button to collapse it.
Map points are color coded. A green point indicates that the project is on or ahead of both schedule and budget. Red points indicate projects that are not. Click a map point to open a dialog: