Labor resources in PMWeb are completely user defined. A labor resource can be something generic like "Framing Crew" or an actual person: "Jane Davis". Labor resources can be linked to a PMWeb Company and Contact if you wish.
 CONTROL PANEL
|
|
 BREADCRUMBS BAR
|
|
 HEADER TOOLBAR
|
|
 RECORD TABS
|
|
 HEADER
-
ID Field - Required. An alphanumeric ID for the record.
-
-
-
Last Name Field - This field defaults from the selected contact but may be edited.
-
First Name Field - This field defaults from the selected contact but may be edited.
-
Description Field - This field defaults from the selected contact but may be edited.
-
-
Title Field - A text field
-
-
-
-
-
-
-
-
Default Hours Per Day Field - Enter a number here. Must be less than or equal to 24.
-
-
Default Cost Field - Read only. This value is from the Classification Matrix and is determined by the combination of the default Classification and the default Pay Type.
-
Target Utilization % Field - Enter a number here between 0 and 100.
-
Scheduling Checkbox - If checked, this resource is available to be assigned to tasks in Schedules.
-
Sub Checkbox - Check this box to mark the Labor Resource as a subcontractor.
-
-
|
|