Estimate Details Tab Table

 
Estimate Details Tab Table
 
Lines can be added to this table using the Add Line Button, the Add Items Button, the Add Assembly Button, or the Add Resources Button. Lines can also be copied to Excel and pasted from the clipboard.
5

BIM ID

5. BIM ID
Read only. If the line was added using the Add Assembly Button the BIM ID of the item will be shown here.
7

Resource Type

7. Resource Type
10

Manufacturer

10. Manufacturer
15

Bid Category

15. Bid Category
17

Quantity

17. Quantity
The quantity of the line
18

Ext. Quantity

18. Ext. Quantity
For future use. Equal to Quantity.
19

Unit Cost

19. Unit Cost
The unit cost of the line.
20

Ext. Cost

20. Ext. Cost
The default is Quantity times Unit Cost but may be edited. If edited, Unit Cost is recalculated as Ext. Cost divided by Quantity.
21

Adjustment 1

21. Adjustment 1
23

Adjustment 2

23. Adjustment 2
24

Total Cost

24. Total Cost
The default is Ext. Cost plus Adjustment 1, Tax, and Adjustment 2, but may be edited. If edited, Ext. Cost is recalculated as Total Cost minus Adjustment 1, Tax, and Adjustment 2 and Unit Cost is recalculated as Ext. Cost divided by Quantity.
25

Funding Source

25. Funding Source
29

Sbtl

29. Sbtl
"Submittal". Check to note that a submittal is needed for the line.